Enerpac Cube Jack™ Enables Railway Bridge Installation Under Power Lines

Customer

Schares GmbH


Location

As part of the modernization of the Oldenburg-Wilhelmshaven railway line to better connect the Wilhelmshaven container terminal to the national railway network, Schares GmbH was tasked with the installation of a double-track railway bridge in suburban Oldenburg.


The challenge involved working in confined conditions under overhead power lines.


Challenge

As part of the modernization of the Oldenburg-Wilhelmshaven railway line to better connect the Wilhelmshaven container terminal to the national railway network, Schares GmbH was tasked with the installation of a double-track railway bridge in suburban Oldenburg. The challenge involved working in confined conditions under overhead power lines.


Products

Enerpac SCJ-100 Cube Jacks

Hero media

Solution

Enerpac SCJ-100 Cube Jacks were used to raise and lower the bridge decks to their final installation position. Working in confined conditions, the SCJ-100s enabled the parapet walls to be raised above ground and then lowered onto the bridge bearings. Schares decided to use its Enerpac SCJ-100 cube jacks and SPMT because the limited space conditions would not allow the use of a mobile crane.   In addition, this approach meant that the overhead power lines could remain untouched.


Each 17.3m long prefabricated bridge deck, weighing 98 tonnes, was supported on a self-propelled modular transporter (SPMT), and brought to the construction site. Four SCJ-100 cube jacks were then used to gradually raise the bridge deck, remove the SPMT and replace it with support jacks. The cube jacks were then placed on a support structure mounted on the SPMT and positioned under the deck. The bridge deck was raised up to 6.5 m. By precise and sensitive maneuvering of the SPMT, the deck was positioned horizontally and lowered into position.  By synchronized lowering of the cube jacks the bridge deck was supported as it reached its final resting position.


"The Enerpac SCJ-100 cube jacks were the right solution for this project," says Christoph Schares, managing director, Schares GmbH. "The load capacity, as well as the small footprint and installation height of the cube jack with a up to 3m lifting height, made this project possible."